Verification Routes

When verifying a building to the UK Net Zero Carbon Buildings Standard (the Standard), there are a few different routes available.

In use (after at least a year of occupancy)​:

Verification: Net Zero Carbon Aligned​

Available if meeting all the requirements of the Standard​

Verification: Performance Evaluation

Available if not meeting all the requirements of the Standard​

At Practical Completion​:

PC On Track verified checks

Each of the above can be pursued as a whole building, or using a landlord-only or tetant-only approach for applicable sectors. More on each of these routes is set out below. 

In-Use Verification

In-use verification takes place after at least a year of occupancy and in-use measurement, and can result in two different outcomes depending on whether or not all the Standard’s requirements are met.​

Appoint a verifier and submit evidence

Verification

Verifier determines: Are the requirements met? 

Verified as meeting the UK NZCBS

Net Zero Carbon Aligned

Performance Evaluation

Yes

No

PE image.png
UK NZCBS Emblem_details.png

Report on pass/fail against UK NZCBS requirements, and how close

Net Zero Carbon Aligned
 

In-use verification

This is the purpose for which the UK Net Zero Carbon Buildings Standard (the Standard) was created: to robustly verify that buildings are Net Zero Carbon Aligned.

 

​​Buildings achieving this designation meet all the requirements of the Standard and are achieving lower-carbon outcomes in line with the UK’s legally binding carbon budgets and targets.​

  • Credibly demonstrate low carbon outcomes

  • Provides confidence to stakeholders on building performance

  • Showcases industry leadership

  • Futureproofs buildings in a decarbonising UK

  • Shifts focus to in-use performance

UK NZCBS Emblem_details.png

Performance Evaluations

Performance Evaluations enable buildings to verify performance against the Standard’s requirements, even if they are not meeting all of them. ​

 

​Key details of Performance Evaluations:

  • Evaluate in-use, measured outcomes

  • ​A “report card”, not Net Zero Carbon Aligned

  • Shows pass/fail for each requirement

  • ​Same depth of process and verification, different outcome

PE image.png

PC on Track

Verified checks may be carried out at Practical Completion to determine whether a building is “On Track” to meet the requirements of the Standard when in-use.​

Undertaken within 6 months of Practical Completion, it is optional to pursue PC On Track, and it is not a pre-requisite for in-use verification. It requires independent, third-party verification in the same way as the in-use verification routes. Buildings achieving PC On Track are not Net Zero Carbon Aligned, and are committed to undergoing full, in-use verification once occupied. ​

  • A milestone for development-linked funding​

  • Improved marketability​

  • Reassurance that Net Zero Carbon Alignment in-use can plausibly be achieved​

  • Facilitates data collection in design and construction​